{"id":6935,"date":"2026-06-10T16:08:40","date_gmt":"2026-06-10T08:08:40","guid":{"rendered":"https:\/\/www.lastelegance.com\/au\/?p=6935"},"modified":"2026-08-17T17:55:19","modified_gmt":"2026-08-17T09:55:19","slug":"deck-cost-in-australia","status":"publish","type":"post","link":"https:\/\/www.lastelegance.com\/au\/deck-cost-in-australia\/","title":{"rendered":"How Much Does a Deck Cost in Australia? A Builder&#8217;s 2026 Quoting Breakdown"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">A bad quote doesn&#8217;t just lose the job. It damages the client relationship.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Most deck projects in Australia land between <strong>$200\u2013$550 per m\u00b2 installed<\/strong>, depending on the material. Composite typically sits at $250\u2013$450\/m\u00b2 on a standard site. But that range hides a lot \u2014 and the gaps are where margins get eaten.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This guide breaks down the whole project: materials, subframe, labour by city, permits, and the extras clients never expect. If you&#8217;re pricing the boards themselves as a trade purchase, see our <a href=\"https:\/\/www.lastelegance.com\/au\/composite-decking-cost\/\">composite decking cost and factory-direct pricing guide<\/a>.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">What Does a Deck Cost per Square Metre?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Materials and labour are separate costs, but most quotes bundle them. Here&#8217;s how they break down across the three main decking materials.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1024\" height=\"683\" src=\"https:\/\/www.lastelegance.com\/au\/wp-content\/uploads\/2026\/06\/composite-deck-installation-cost-australia-diy-1024x683.jpg\" alt=\"\" class=\"wp-image-6938\" title=\"\" srcset=\"https:\/\/www.lastelegance.com\/au\/wp-content\/uploads\/2026\/06\/composite-deck-installation-cost-australia-diy-1024x683.jpg 1024w, https:\/\/www.lastelegance.com\/au\/wp-content\/uploads\/2026\/06\/composite-deck-installation-cost-australia-diy-300x200.jpg 300w, https:\/\/www.lastelegance.com\/au\/wp-content\/uploads\/2026\/06\/composite-deck-installation-cost-australia-diy-768x512.jpg 768w, https:\/\/www.lastelegance.com\/au\/wp-content\/uploads\/2026\/06\/composite-deck-installation-cost-australia-diy.jpg 1200w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Supply-only cost (boards and fixings, no labour):<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><th>Material<\/th><th>Supply cost per m\u00b2<\/th><\/tr><tr><td>Treated pine decking<\/td><td>$40\u2013$90\/m\u00b2<\/td><\/tr><tr><td>Hardwood timber decking (merbau, spotted gum)<\/td><td>$90\u2013$200\/m\u00b2<\/td><\/tr><tr><td>Composite decking boards<\/td><td>$100\u2013$230\/m\u00b2<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Total installed cost (supply + subframe + labour):<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><th>Material<\/th><th>Total installed cost per m\u00b2<\/th><\/tr><tr><td>Treated pine decking<\/td><td>$200\u2013$350\/m\u00b2<\/td><\/tr><tr><td>Hardwood timber decking<\/td><td>$320\u2013$550\/m\u00b2<\/td><\/tr><tr><td>Composite decking<\/td><td>$250\u2013$450\/m\u00b2 typical<br>$450\u2013$600+\/m\u00b2 complex<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">A rough cost breakdown for a typical composite deck: <strong>35\u201345% boards and fixings, 30\u201345% labour, 15\u201325% subframe and footings, 5\u201310% other<\/strong>. On a sloping or elevated site, the subframe share rises \u2014 often to 35% or more, and it comes straight out of the margin you assumed on a flat-site rate.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Full project cost by deck size (composite, fully installed):<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><th>Deck size<\/th><th>Estimated total cost<\/th><\/tr><tr><td>Small (10\u201320 m\u00b2)<\/td><td>$3,500\u2013$9,000<\/td><\/tr><tr><td>Medium (30\u201340 m\u00b2)<\/td><td>$9,000\u2013$18,000<\/td><\/tr><tr><td>Large (50 m\u00b2+)<\/td><td>$17,500\u2013$35,000+<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">Cost per m\u00b2 drops as deck size increases. Labour setup costs spread across more square metres \u2014 improving efficiency on bigger jobs.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">What Drives the Cost of Your Deck?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Two quotes for the same deck can differ by thousands. Here&#8217;s what moves the number.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"683\" src=\"https:\/\/www.lastelegance.com\/au\/wp-content\/uploads\/2026\/06\/composite-decking-cost-australia-backyard-entertaining-1024x683.jpg\" alt=\"\" class=\"wp-image-6941\" title=\"\" srcset=\"https:\/\/www.lastelegance.com\/au\/wp-content\/uploads\/2026\/06\/composite-decking-cost-australia-backyard-entertaining-1024x683.jpg 1024w, https:\/\/www.lastelegance.com\/au\/wp-content\/uploads\/2026\/06\/composite-decking-cost-australia-backyard-entertaining-300x200.jpg 300w, https:\/\/www.lastelegance.com\/au\/wp-content\/uploads\/2026\/06\/composite-decking-cost-australia-backyard-entertaining-768x512.jpg 768w, https:\/\/www.lastelegance.com\/au\/wp-content\/uploads\/2026\/06\/composite-decking-cost-australia-backyard-entertaining.jpg 1200w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Deck size:<\/strong> Bigger decks cost more overall, but the cost per square metre tends to fall as the size increases.<\/li>\n\n\n\n<li><strong>Material choice:<\/strong> This is the biggest single cost driver. Treated pine decking is the cheapest upfront. Composite decking and hardwood timber sit higher at the board level.<\/li>\n\n\n\n<li><strong>Design complexity:<\/strong> Straight boards on a flat site are the fastest to build. Curves, angled layouts, and multiple levels take more cutting and fixing time \u2014 each adds to labour costs.<\/li>\n\n\n\n<li><strong>Site conditions:<\/strong> Sloping ground, difficult access, and height above ground push up the subframe and footing cost. On a steep site, the subframe can be the single largest line item.<\/li>\n\n\n\n<li><strong>Subframe material:<\/strong> Steel subframes cost more upfront than timber but last longer \u2014 especially in termite-prone or high-moisture areas.<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\">Labour Costs \u2014 What Builders Charge in 2026<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Labour accounts for <strong>30\u201345% of the total cost<\/strong> of a deck project and typically runs <strong>$80\u2013$230\/m\u00b2<\/strong> across Australia. The bottom of that range is simple ground-level work in regional areas; the top is complex or elevated builds in Sydney and Perth.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">That rate covers layout, fixing, cutting and board installation. It does <strong>not<\/strong> include subframe construction, excavation, permit applications or balustrades \u2014 price those separately, or you&#8217;ll absorb them.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Composite decking has a real edge on labour time. The hidden fastener clip system is faster than face-screwed timber: boards slot into clips fixed to the joists, with no surface screws, no pre-drilling and no splitting risk. On volume projects, that installation speed cuts your labour cost per m\u00b2 directly \u2014 which is where a lot of the composite price premium quietly pays for itself.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Subframe and Joist Spacing<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The subframe is the structural base your boards sit on. It&#8217;s not optional, and it&#8217;s the line most often under-costed at quote stage.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th>Subframe type<\/th><th>Cost per m\u00b2<\/th><th>Best suited to<\/th><\/tr><\/thead><tbody><tr><td>Treated pine<\/td><td>$30\u2013$45\/m\u00b2<\/td><td>Standard ground-level residential<\/td><\/tr><tr><td>Composite battens<\/td><td>$40\u2013$60\/m\u00b2<\/td><td>Decks over concrete or existing slabs<\/td><\/tr><tr><td>Steel framing<\/td><td>$60\u2013$90\/m\u00b2<\/td><td>Elevated decks, termite zones, commercial<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">Joist spacing matters. For composite boards, the recommended spacing is\u00a0<strong>300\u2013350 mm centre to centre<\/strong>. Go wider, and you risk board deflection \u2014 and in most cases you&#8217;ll void the warranty. Hidden fastener clips also need a solid joist to grip, so spacing errors show up as movement underfoot within the first season.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The&nbsp;<strong>NCC (National Construction Code)<\/strong>&nbsp;sets structural requirements for deck subframes. Any quote that doesn&#8217;t specify subframe material and spacing isn&#8217;t a complete quote.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Hidden Costs That Catch Buyers Off Guard<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">These are the costs that don&#8217;t always make it into the first quote:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Council permits and approvals:<\/strong> Approval requirements vary between states and local councils. Costs commonly range from $500\u2013$2,500+ depending on location and approval pathway.<\/li>\n\n\n\n<li><strong>Balustrades:<\/strong> Under the NCC, a compliant balustrade is required where there&#8217;s a fall of 1 metre or more. Budget $200\u2013$500 per lineal metre depending on material and design.<\/li>\n\n\n\n<li><strong>Subframe and footings:<\/strong> Often the biggest surprise \u2014 especially on sloping or elevated sites.<\/li>\n\n\n\n<li><strong>Stairs:<\/strong> Each flight adds $800\u2013$2,000+, depending on height and material.<\/li>\n\n\n\n<li><strong>Waste and cut allowance:<\/strong> Add 10\u201315% for a standard layout. More for complex cuts or irregular shapes.<\/li>\n\n\n\n<li><strong>Delivery and freight:<\/strong> Relevant for regional or remote sites.<\/li>\n\n\n\n<li><strong>Site preparation:<\/strong> Clearing, levelling, or removing an existing structure all add to the final price.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><em>Approval requirements and costs vary between states, territories, and local councils. Always confirm with your local council or building certifier before you start.<\/em><\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Composite vs Timber Decking: Price Comparison<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The upfront price tells only part of the story. The total cost over 10 years is where timber decking and composite decking diverge most.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Treated pine requires oiling or staining every 1\u20132 years. Hardwood timber decking (merbau, spotted gum) generally needs oiling every 2\u20133 years. Composite decking needs only occasional cleaning with water \u2014 no oiling, sanding, staining, or recoating.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>10-year total cost of ownership per m\u00b2 (based on 30 m\u00b2 deck):<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><th><\/th><th>Treated Pine<\/th><th>Hardwood (Merbau\/Spotted Gum)<\/th><th>Capped Composite<\/th><\/tr><tr><td>Materials (supply only)<\/td><td>$60\u2013$90\/m\u00b2<\/td><td>$120\u2013$200\/m\u00b2<\/td><td>$100\u2013$190\/m\u00b2<\/td><\/tr><tr><td>Labour + subframe<\/td><td>$120\u2013$180\/m\u00b2<\/td><td>$150\u2013$220\/m\u00b2<\/td><td>$150\u2013$260\/m\u00b2<\/td><\/tr><tr><td><strong>Upfront total<\/strong><\/td><td><strong>$180\u2013$270\/m\u00b2<\/strong><\/td><td><strong>$270\u2013$420\/m\u00b2<\/strong><\/td><td><strong>$250\u2013$450\/m\u00b2<\/strong><\/td><\/tr><tr><td>Annual maintenance (DIY)<\/td><td>$15\u2013$25\/m\u00b2<\/td><td>$10\u2013$20\/m\u00b2<\/td><td>~$0\u2013$2\/m\u00b2<\/td><\/tr><tr><td>10-year maintenance total<\/td><td>$150\u2013$250\/m\u00b2<\/td><td>$100\u2013$200\/m\u00b2<\/td><td>~$0\u2013$20\/m\u00b2<\/td><\/tr><tr><td><strong>10-year TCO<\/strong><\/td><td><strong>$330\u2013$520\/m\u00b2<\/strong><\/td><td><strong>$370\u2013$620\/m\u00b2<\/strong><\/td><td><strong>$250\u2013$470\/m\u00b2<\/strong><\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">On a 30 m\u00b2 deck, the maintenance savings from composite runs roughly <strong>$4,500\u2013$7,500 over ten years<\/strong>. That gap is real whether the maintenance is DIY or contracted out \u2014 and it&#8217;s the number to put in front of a client who&#8217;s balking at the upfront difference.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Termite exposure adds a second argument. In Queensland, northern NSW and much of WA, a timber deck carries a replacement risk that composite removes outright.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The material line in this table assumes distribution-chain pricing. Trade buyers sourcing at volume see a different number.<\/p>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n<p class=\"wp-block-paragraph\"><strong><a href=\"https:\/\/www.lastelegance.com\/au\/contact\/\">Request a Trade Quote<\/a><\/strong> \u2014 get pricing, lead times and custom specs for your next composite deck project.<\/p>\n<\/blockquote>\n\n\n\n<h2 class=\"wp-block-heading\">Deck Cost by Size: Small, Medium, and Large<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Here&#8217;s a worked example for each size band using composite decking, fully installed in 2026. These figures assume a flat or near-level site with standard access.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th>Deck size<\/th><th>Total cost range<\/th><th>Worked example (composite)<\/th><\/tr><\/thead><tbody><tr><td>Small (10\u201320 m\u00b2)<\/td><td>$4,000\u2013$9,000<\/td><td><strong>15 m\u00b2:<\/strong>&nbsp;~$6,750 (boards $2,250 + subframe $1,500 + labour $2,400 + fixings $600)<\/td><\/tr><tr><td>Medium (30\u201340 m\u00b2)<\/td><td>$9,000\u2013$16,000<\/td><td><strong>35 m\u00b2:<\/strong>&nbsp;~$14,000 (boards $5,250 + subframe $3,000 + labour $5,000 + fixings $750)<\/td><\/tr><tr><td>Large (50 m\u00b2+)<\/td><td>$16,000\u2013$30,000+<\/td><td><strong>60 m\u00b2:<\/strong>&nbsp;~$21,600 (boards $8,400 + subframe $4,800 + labour $7,800 + fixings $600)<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">Cost per m\u00b2 falls as deck size increases. Smaller projects absorb a larger share of fixed setup costs; larger projects benefit from labour efficiency and bulk material pricing.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Typical installed rates by size:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Small decks: ~$400\u2013$550\/m\u00b2<\/li>\n\n\n\n<li>Medium decks: ~$350\u2013$450\/m\u00b2<\/li>\n\n\n\n<li>Large decks: ~$300\u2013$400\/m\u00b2<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Sloping sites, stairs, and balustrades aren&#8217;t included. Add these to your budget early \u2014 they&#8217;re common on larger jobs, and each adds a real amount.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Do Deck Prices Vary by City?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Yes, and the gap is real. Decking material costs run roughly the same across Australia. Labour rates are where city-to-city differences show up.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">These are indicative installation labour rates per m\u00b2 for 2026. Local quotes will vary by contractor, access, and timing \u2014 treat these as benchmarks, not fixed prices.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><th>City<\/th><th>Labour cost per m\u00b2 (indicative, 2026)<\/th><\/tr><tr><td>Sydney<\/td><td>$170\u2013230<\/td><\/tr><tr><td>Melbourne<\/td><td>$150\u2013220<\/td><\/tr><tr><td>Perth<\/td><td>$150\u2013220<\/td><\/tr><tr><td>Brisbane<\/td><td>$140\u2013200<\/td><\/tr><tr><td>Adelaide<\/td><td>$130\u2013190<\/td><\/tr><tr><td>Hobart<\/td><td>$130\u2013190<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">Perth&#8217;s construction market has run hot in recent years. High demand pushed trade rates up, and they remain elevated into 2026. Sydney runs similarly.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Brisbane and Melbourne generally sit lower, but access, design complexity and contractor availability all shift the final price. Regional rates typically fall below every figure in this table \u2014 sometimes to $80\u2013$120\/m\u00b2 for straightforward ground-level work \u2014 though delivery costs partly offset the savings.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The best approach for a client comparing prices: two to three itemised quotes from local builders, with materials, subframe and labour as separate line items.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Is Composite Decking Worth the Higher Upfront Cost?<\/h2>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"683\" src=\"https:\/\/www.lastelegance.com\/au\/wp-content\/uploads\/2026\/06\/covered-deck-cost-australia-alfresco-outdoor-kitchen-1024x683.jpg\" alt=\"\" class=\"wp-image-6940\" title=\"\" srcset=\"https:\/\/www.lastelegance.com\/au\/wp-content\/uploads\/2026\/06\/covered-deck-cost-australia-alfresco-outdoor-kitchen-1024x683.jpg 1024w, https:\/\/www.lastelegance.com\/au\/wp-content\/uploads\/2026\/06\/covered-deck-cost-australia-alfresco-outdoor-kitchen-300x200.jpg 300w, https:\/\/www.lastelegance.com\/au\/wp-content\/uploads\/2026\/06\/covered-deck-cost-australia-alfresco-outdoor-kitchen-768x512.jpg 768w, https:\/\/www.lastelegance.com\/au\/wp-content\/uploads\/2026\/06\/covered-deck-cost-australia-alfresco-outdoor-kitchen.jpg 1200w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">In most cases, yes \u2014 especially for commercial projects, high-traffic outdoor spaces, pool decks, and any site with termite risk or high moisture exposure.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The commercial argument is simple: composite removes the recurring maintenance line from your client&#8217;s 10-year budget and the callback risk from yours. Over a 10-year window, composite&#8217;s lower maintenance and avoided replacement costs typically close the price gap against hardwood. Against treated pine, composite often wins outright on total cost.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">There&#8217;s also a quoting advantage worth naming: a composite deck lets you present a fixed ten-year number. A timber deck can&#8217;t be quoted that way honestly, because the maintenance cost is a variable you don&#8217;t control.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Not all composite is equal, though. Cap thickness, HDPE density and slip rating are what separate a 25-year board from a 7-year one. We&#8217;ve set out the specs to check, and what each grade costs, in the <a href=\"https:\/\/www.lastelegance.com\/au\/composite-decking-cost\/\">composite decking cost guide<\/a>.<\/p>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n<p class=\"wp-block-paragraph\"><strong><a href=\"https:\/\/www.lastelegance.com\/au\/contact\/\">Request a Quote<\/a><\/strong> \u2014 talk to our team about pricing, lead times and custom specs for your next composite deck project.<\/p>\n<\/blockquote>\n\n\n\n<h2 class=\"wp-block-heading\">Council Approval: When Do You Need It?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Permit requirements vary by state, territory and local council. Common triggers include deck height above ground, boundary setbacks, attachment to the dwelling, and total floor area.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In many jurisdictions, low-level decks under roughly 600 mm above ground may be exempt. Raised or attached decks often require building approval. Permit fees commonly range from <strong>$500 to $2,500+<\/strong>, and approval timeframes can add weeks to a programme.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Flag permit requirements during quoting, not after. An approval discovered mid-build is a stop-work risk and a variation conversation nobody enjoys. Always confirm with the local council or a building certifier before work starts.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><em>Bushfire-prone areas add a BAL (Bushfire Attack Level) requirement \u2014 confirm the site&#8217;s BAL classification and check that the chosen decking boards are rated accordingly.<\/em><\/p>\n\n\n\n<h2 class=\"wp-block-heading\">FAQ<\/h2>\n\n\n<div id=\"rank-math-faq\" class=\"rank-math-block\">\n<div class=\"rank-math-list \">\n<div id=\"faq-question-1786957522521\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question \">How should I structure a deck quote for a client?<\/h3>\n<div class=\"rank-math-answer \">\n\n<p>List materials, subframe and footings, labour, and extras (stairs, balustrades, permits, waste removal) as separate line items. Bundled quotes are where variations turn into arguments. Itemised quotes also make it obvious why your price differs from a cheaper competitor&#8217;s \u2014 usually because theirs has left the subframe or the fascia out.<\/p>\n\n<\/div>\n<\/div>\n<div id=\"faq-question-1786957523685\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question \">How much should I allow for waste and offcuts?<\/h3>\n<div class=\"rank-math-answer \">\n\n<p>Allow 10\u201315% on a standard rectangular layout, and more on angled, curved or multi-level designs. Ordering to the exact m\u00b2 figure is the most common cause of a mid-build materials delay, and a second delivery costs far more than the extra boards.<\/p>\n\n<\/div>\n<\/div>\n<div id=\"faq-question-1786960319980\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question \">How long does composite decking last?<\/h3>\n<div class=\"rank-math-answer \">\n\n<p>A quality capped composite deck typically lasts 25 years or more with minimal upkeep \u2014 well beyond treated pine (10\u201315 years) and broadly on par with premium hardwood. The cap layer is the key: a thicker cap resists UV fading, surface moisture and wear far better than thin alternatives. The structural warranty length is the clearest signal of how confident a supplier is in their product&#8217;s lifespan.<\/p>\n\n<\/div>\n<\/div>\n<div id=\"faq-question-1786960321523\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question \">Does composite decking get hot in the sun?<\/h3>\n<div class=\"rank-math-answer \">\n\n<p>Yes \u2014 all dark hard surfaces absorb heat, and composite is no exception. In direct summer sun, surface temperatures rise on darker colours. Lighter colours absorb less heat. Quality HDPE composite with UV stabilisers manages heat retention better than cheaper boards, which is worth factoring in on pool decks and north-facing outdoor spaces.<\/p>\n\n<\/div>\n<\/div>\n<div id=\"faq-question-1786960336667\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question \">What is a realistic budget for a 20 m\u00b2 composite deck?<\/h3>\n<div class=\"rank-math-answer \">\n\n<p>A new 20 m\u00b2 composite deck typically costs $6,000\u2013$13,000 installed. That includes decking boards, subframe, labour and basic site preparation, but excludes stairs, balustrades and permit fees.<\/p>\n\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n\n\n<p class=\"wp-block-paragraph\"><strong><a href=\"https:\/\/www.lastelegance.com\/au\/composite-decking\/\">See Our Full Composite Decking Range<\/a><\/strong> \u2014 Dimensions, colour options, technical specs, and custom order enquiries for trade buyers and distributors.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>A bad quote doesn&#8217;t just lose the job. It damages the client relationship. Most deck projects in Australia land between $200\u2013$550 per m\u00b2 installed, depending on the material. Composite typically sits at $250\u2013$450\/m\u00b2 on a standard site. But that range hides a lot \u2014 and the gaps are where margins get eaten. This guide breaks [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":6936,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1401],"tags":[],"class_list":["post-6935","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-composite-decking"],"_links":{"self":[{"href":"https:\/\/www.lastelegance.com\/au\/wp-json\/wp\/v2\/posts\/6935","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.lastelegance.com\/au\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.lastelegance.com\/au\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.lastelegance.com\/au\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.lastelegance.com\/au\/wp-json\/wp\/v2\/comments?post=6935"}],"version-history":[{"count":0,"href":"https:\/\/www.lastelegance.com\/au\/wp-json\/wp\/v2\/posts\/6935\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.lastelegance.com\/au\/wp-json\/wp\/v2\/media\/6936"}],"wp:attachment":[{"href":"https:\/\/www.lastelegance.com\/au\/wp-json\/wp\/v2\/media?parent=6935"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.lastelegance.com\/au\/wp-json\/wp\/v2\/categories?post=6935"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.lastelegance.com\/au\/wp-json\/wp\/v2\/tags?post=6935"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}