{"id":11215,"date":"2026-10-21T17:35:59","date_gmt":"2026-10-21T06:35:59","guid":{"rendered":"https:\/\/www.lastelegance.com\/au\/?p=11215"},"modified":"2026-10-27T18:57:23","modified_gmt":"2026-10-27T07:57:23","slug":"import-composite-decking-china-australia-lead-time","status":"publish","type":"post","link":"https:\/\/www.lastelegance.com\/au\/import-composite-decking-china-australia-lead-time\/","title":{"rendered":"Importing Composite Decking from China to Australia: Lead Times, Container Shipping &amp; Costs"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">A late container can leave a distributor short of stock or a builder waiting for materials. Unexpected shipping and import costs can also cut into profit margins.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For Australian businesses buying composite decking from China, factory production is only part of the timeline. Sea freight, customs clearance, and local delivery all affect when an order arrives. Custom colours and profiles may also add time before production starts.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This guide explains how to estimate lead times, calculate landed costs, and avoid common shipping delays. You&#8217;ll also learn how to plan orders around stock needs or project deadlines.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Key Takeaways<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Total Import Lead Time:<\/strong> Allow 50\u201380 days from order confirmation to delivery in Australia, plus a 7\u201314 day buffer for potential shipping delays.<\/li>\n\n\n\n<li><strong>Production &amp; Container Shipping:<\/strong> Standard 20ft containers take 15\u201320 days to produce and pack, while 40ft containers require 20\u201325 days. Sea freight typically takes another 24\u201332 days.<\/li>\n\n\n\n<li><strong>Customs &amp; Biosecurity Clearance:<\/strong> Australian imports require accurate shipping documents, correct HS code classification, and ABF\/BICON compliance. Allow 2\u201310 business days for clearance.<\/li>\n\n\n\n<li><strong>Total Landed Costs:<\/strong> Budget beyond the FOB price. Include sea freight, insurance, applicable import duties, 10% GST, customs fees, port charges, and domestic delivery.<\/li>\n\n\n\n<li><strong>Avoiding Costly Delays:<\/strong> Finalise product specifications before production, allow extra time for custom colours or profiles, and plan around Chinese factory holidays and vessel schedules.<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">How Long Does Production Take per Container?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Production time depends on container size. These figures cover production and packing combined, for standard profiles and colours:<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1024\" height=\"575\" src=\"https:\/\/www.lastelegance.com\/au\/wp-content\/uploads\/2026\/10\/composite-decking-factory-production-1024x575.jpg\" alt=\"\" class=\"wp-image-11221\" title=\"\" srcset=\"https:\/\/www.lastelegance.com\/au\/wp-content\/uploads\/2026\/10\/composite-decking-factory-production-1024x575.jpg 1024w, https:\/\/www.lastelegance.com\/au\/wp-content\/uploads\/2026\/10\/composite-decking-factory-production-300x168.jpg 300w, https:\/\/www.lastelegance.com\/au\/wp-content\/uploads\/2026\/10\/composite-decking-factory-production-767x431.jpg 767w, https:\/\/www.lastelegance.com\/au\/wp-content\/uploads\/2026\/10\/composite-decking-factory-production.jpg 1500w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><th>Container size<\/th><th>Production + packing<\/th><th>Sea freight to Australia<\/th><\/tr><tr><td>20ft<\/td><td>15\u201320 days<\/td><td>24\u201332 days<\/td><\/tr><tr><td>40ft<\/td><td>20\u201325 days<\/td><td>24\u201332 days<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">The gap between a 20ft and 40ft order can reach ten days on production alone. A 40ft order needs more cutting and conditioning runs \u2014 that&#8217;s what drives the extra time. Custom orders run to a different clock.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">As a rough guide, a 20ft container holds about 850\u2013900 m\u00b2 of standard decking boards; a 40ft holds about 1,000\u20131,100 m\u00b2. Use this to size your container before you quote.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Have your m\u00b2 requirement and container size ready? Submit it for a confirmed production slot.<\/strong> \u2192 Request a Quote<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Does a Custom Profile or Colour Add to Lead Time?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Yes \u2014 and the extra time sits before production starts, not inside it.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Standard colours and board sizes run on existing schedules. The clock starts when your order and deposit are confirmed. Custom colours or non-standard profiles work differently: before production begins, you need to sign off a colour sample or confirm mould specs. That approval stage sits outside the standard production window.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">How long it takes depends on the brief and how many revision rounds you need. If you&#8217;re specifying a project-specific colour, confirm sample approval lead time at the quoting stage. Build it into your programme before the production clock starts.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">LastElegance supports custom lengths, colours, packaging, and surface textures \u2014 including custom moulds. Sampling lead time is confirmed per order.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">What Stages Make Up the Import Timeline?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">For a standard order in stock colours, expect 50\u201380 days from order confirmation to delivery at your warehouse or site. Here&#8217;s how that time breaks down \u2014 and who controls each stage.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><th>Stage<\/th><th>Typical duration<\/th><th>Who controls it<\/th><\/tr><tr><td>Order confirmation and specification lock<\/td><td>1\u20133 days<\/td><td>You<\/td><\/tr><tr><td>Production and packing<\/td><td>15\u201325 days<\/td><td>Manufacturer<\/td><\/tr><tr><td>Export customs and container loading<\/td><td>3\u20135 days<\/td><td>Freight forwarder<\/td><\/tr><tr><td>Sea freight to Australia<\/td><td>24\u201332 days<\/td><td>Shipping line<\/td><\/tr><tr><td>Biosecurity and customs clearance (ABF + BICON)<\/td><td>2\u201310 business days<\/td><td>Customs broker<\/td><\/tr><tr><td>Domestic delivery to site<\/td><td>3\u20137 days<\/td><td>Freight carrier<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">Notice that production is not always the longest stage. Sea freight and the Australian clearance steps together often take longer. And the first stage \u2014 specification lock \u2014 is the one most buyers lose time on without realising it.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Port-to-port time is not delivery-to-site time.<\/strong> The sea freight window ends when the vessel berths at an Australian port. From that point, biosecurity screening, ABF clearance, and domestic freight all add days before boards reach site.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">What Does Australian Customs Clearance Involve?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">This is the stage first-time importers most often underestimate.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"683\" src=\"https:\/\/www.lastelegance.com\/au\/wp-content\/uploads\/2026\/10\/composite-decking-import-australia-1024x683.jpg\" alt=\"\" class=\"wp-image-11225\" title=\"\" srcset=\"https:\/\/www.lastelegance.com\/au\/wp-content\/uploads\/2026\/10\/composite-decking-import-australia-1024x683.jpg 1024w, https:\/\/www.lastelegance.com\/au\/wp-content\/uploads\/2026\/10\/composite-decking-import-australia-300x200.jpg 300w, https:\/\/www.lastelegance.com\/au\/wp-content\/uploads\/2026\/10\/composite-decking-import-australia-768x512.jpg 768w, https:\/\/www.lastelegance.com\/au\/wp-content\/uploads\/2026\/10\/composite-decking-import-australia.jpg 1536w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">The <strong>Australian Border Force (ABF)<\/strong> handles the import declaration, duties, and GST. The <strong>Department of Agriculture<\/strong> handles biosecurity screening through BICON. Wood fibre content in WPC decking puts it in scope under those rules.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A licensed customs broker manages both processes. With correct documents in hand, clearance takes 2\u201310 business days. Missing or incorrect documents are the most common cause of delays \u2014 and delays compound fast once a vessel is at berth. Port storage charges start accumulating from day one.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Brief your freight forwarder before the container ships, not after it arrives.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Ask for the document checklist we use for every container to Australia.<\/strong> \u2192 Contact Our Sales Team<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">What Documents Must Travel with the Shipment?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Confirm these are in order before the vessel departs:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Commercial invoice<\/strong> \u2014 must describe the goods correctly, including wood fibre content<\/li>\n\n\n\n<li><strong>Packing list<\/strong> \u2014 itemised by board size, quantity, and weight<\/li>\n\n\n\n<li><strong>Bill of lading<\/strong> \u2014 issued by the shipping line; confirms the contract of carriage<\/li>\n\n\n\n<li><strong>Certificate of origin<\/strong> \u2014 needed for duty assessment and tariff rate determination<\/li>\n\n\n\n<li><strong>Correct HS code classification<\/strong> \u2014 misclassification is a common trigger for re-examination delays<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">For WPC composite products, the HS code must be accurate. A customs broker can advise on phytosanitary requirements for wood-content goods. Confirm the full document set with your broker before the vessel leaves.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">What Does the Total Landed Cost Include?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The FOB price is only the starting point. Importers who budget on FOB alone often end up short. Here&#8217;s what builds the full landed cost for a composite decking container:<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><th>Cost component<\/th><th>Who pays<\/th><th>Basis<\/th><\/tr><tr><td>FOB price<\/td><td>Buyer<\/td><td>Per m\u00b2 \u00d7 volume, as quoted<\/td><\/tr><tr><td>Sea freight<\/td><td>Buyer<\/td><td>Per container (20ft or 40ft)<\/td><\/tr><tr><td>Marine insurance<\/td><td>Buyer<\/td><td>% of cargo value<\/td><\/tr><tr><td>Import duties<\/td><td>Buyer<\/td><td>Depends on HS code \u2014 confirm with broker<\/td><\/tr><tr><td>GST (10%)<\/td><td>Buyer<\/td><td>Applied to customs value plus freight<\/td><\/tr><tr><td>Customs broker fees<\/td><td>Buyer<\/td><td>Fixed or % \u2014 varies by broker<\/td><\/tr><tr><td>Port and handling charges<\/td><td>Buyer<\/td><td>Per container, varies by port<\/td><\/tr><tr><td>Domestic freight to site<\/td><td>Buyer<\/td><td>Per delivery, based on distance<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">GST at 10% applies to the customs value of the goods plus sea freight \u2014 not the FOB price alone. Import duty rates depend on the specific HS code for WPC products. Confirm the current rate with a customs broker before you quote. Rates can change, and the wrong assumption costs you margin.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Get an FOB price per m\u00b2 for your volume \u2014 we&#8217;ll walk through landed cost components with you.<\/strong> \u2192 Request Trade Pricing<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Is Air Freight Worth It for Composite Decking?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">For project-scale orders, no. The weight-to-value ratio makes it uneconomical.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Composite decking boards are heavy. The <a href=\"https:\/\/www.lastelegance.com\/au\/composite-decking\/composite-decking-timberluxe\/\">TimberLuxe<\/a> 140\u00d723 profile runs at 4.20 kg per linear metre. Even the <a href=\"https:\/\/www.lastelegance.com\/au\/composite-screening\/linea-composite-screening-batten\/\">Linea Batten<\/a> 50\u00d750 screen batten weighs 1.10 kg\/lm. Air freight rates per kilogram run 10\u201315 times higher than sea freight \u2014 costs quickly exceed product value for anything beyond a small consignment.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Air freight makes sense for two things: urgent sample confirmation before a bulk order, or a small replacement shipment to resolve a site defect. For any full project order, sea freight is the only practical route.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">If you&#8217;re looking at air freight because a project is running behind, the better fix is buffer stock or earlier order placement.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">When Should You Order Against Your Site Date?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Work backwards from your site start date. Add each stage in reverse:<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>Domestic delivery to site:<\/strong> 3\u20137 days<\/li>\n\n\n\n<li><strong>Australian customs clearance (ABF + BICON):<\/strong> 2\u201310 business days<\/li>\n\n\n\n<li><strong>Sea freight:<\/strong> 24\u201332 days<\/li>\n\n\n\n<li><strong>Export clearance and container loading:<\/strong> 3\u20135 days<\/li>\n\n\n\n<li><strong>Production and packing:<\/strong> 15\u201320 days (20ft) or 20\u201325 days (40ft)<\/li>\n<\/ol>\n\n\n\n<p class=\"wp-block-paragraph\">That&#8217;s roughly 50\u201380 days from order placement to boards on site. Add at least 7\u201314 days buffer for vessel schedule gaps and port congestion.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Vessels on major China\u2013Australia routes run weekly or bi-weekly \u2014 not daily. A missed sailing adds a week or two. Port congestion at busy periods can add more.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Worked example \u2014 40ft container, boards needed on site by 1 March:<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Working back:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Allow 7 days domestic delivery \u2192 port despatch by 22 February<\/li>\n\n\n\n<li>Allow 7 days customs clearance \u2192 vessel arrival by 15 February<\/li>\n\n\n\n<li>Allow 32 days sea freight \u2192 container departs China by 14 January<\/li>\n\n\n\n<li>Allow 5 days export clearance and loading \u2192 9 January<\/li>\n\n\n\n<li>Allow 25 days production and packing \u2192 <strong>place order by 15 December<\/strong><\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">For a 1 March site start, the order deadline is mid-December \u2014 not late January. That gap catches most builders off guard the first time they run the numbers.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For custom colours or profiles, add sample approval time before production begins.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><em>We see this pattern across orders every season \u2014 teams that run the reverse timeline early avoid the crunch. Teams that don&#8217;t end up paying for air freight on replacement boards.<\/em><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Tell us your site start date and m\u00b2 requirement \u2014 we&#8217;ll confirm the order deadline and a production slot.<\/strong> \u2192 Request a Quote<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Where Do Delays Actually Come From?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Most composite decking orders that run late don&#8217;t fail at production. They fail at three other points that are easy to plan around \u2014 once you know where they are.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Vessel frequency on China\u2013Australia routes.<\/strong> Direct services from major Chinese ports to Sydney, Melbourne, and Brisbane run weekly or bi-weekly. Miss a vessel by one day and you wait 7\u201314 days for the next departure. That&#8217;s before any weather or port congestion adds to the count. A container that misses its planned sailing by a single day can land two weeks later.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>The Chinese production calendar.<\/strong> Two annual shutdowns affect ordering windows. Chinese New Year typically falls between late January and mid-February \u2014 factories wind down for 2\u20133 weeks around it, and the month before is the most congested of the year. The October Golden Week (1\u20137 October) causes a shorter but still real slowdown. Orders confirmed well ahead of these dates clear without issue. Orders confirmed in mid-January or late September almost certainly won&#8217;t.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Documentation errors at the Australian border.<\/strong> WPC composite decking triggers biosecurity screening under BICON rules because it contains natural wood fibre. The checks themselves are routine when paperwork is correct. A wrong HS code, a vague product description, or a packing list that doesn&#8217;t match the invoice is enough to hold a container at port while storage charges build. This type of delay is entirely preventable.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Specification changes after the deposit.<\/strong> A colour swap or length change requested after extrusion begins is not a minor adjustment \u2014 it&#8217;s often a partial restart. Once production is running, changing the spec is the most expensive thing a buyer can do to their own timeline. Lock the full bill of materials before the deposit is paid.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">How Do You Speed Up the Timeline?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Five things give you the most control over lead time \u2014 none of them requires rushing production or paying for air freight.<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>Lock the full specification before paying the deposit.<\/strong> Board profile, colour, length, surface texture \u2014 and accessories. Clips, fasteners, and end caps ordered after the fact often ship separately, arrive late, and delay site installation.<\/li>\n\n\n\n<li><strong>Choose standard profiles and colours where the design allows.<\/strong> This is the biggest lever. Standard profiles skip the sample approval stage entirely. That saves 10 days or more on the total timeline.<\/li>\n\n\n\n<li><strong>Ask your supplier to book the vessel slot when production starts, not when goods are ready.<\/strong> Vessel bookings on China\u2013Australia routes fill early in peak periods. Waiting for a ready-to-ship confirmation before booking risks a rolled container and a 7\u201314 day delay.<\/li>\n\n\n\n<li><strong>Have your customs broker briefed before the container ships.<\/strong> Send the commercial invoice, packing list, and HS code classification for review before the vessel departs. A document error caught at the supplier&#8217;s end costs nothing to fix. The same error caught at an Australian port costs storage fees and time.<\/li>\n\n\n\n<li><strong>Plan around the Chinese production calendar.<\/strong> For any project with a fixed site date, check whether your order window overlaps with Chinese New Year or Golden Week. For Chinese New Year, confirm your order by early December to clear the shutdown. Don&#8217;t count on a mid-January order making it through on schedule.<\/li>\n<\/ol>\n\n\n\n<h2 class=\"wp-block-heading\">FAQ<\/h2>\n\n\n<div id=\"rank-math-faq\" class=\"rank-math-block\">\n<div class=\"rank-math-list \">\n<div id=\"faq-question-1792564522422\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question \">Is sea freight time the same as delivery to site?<\/h3>\n<div class=\"rank-math-answer \">\n\n<p>No. Sea freight covers port-to-port only. After arrival, add Australian biosecurity and customs clearance (2\u201310 business days) and domestic freight from the port to your warehouse or site. Door-to-door runs 7\u201317 days longer than the sea freight window alone.<\/p>\n\n<\/div>\n<\/div>\n<div id=\"faq-question-1792564524113\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question \">Do I pay duties and GST on composite decking from China?<\/h3>\n<div class=\"rank-math-answer \">\n\n<p>GST at 10% applies to the customs value of the goods plus sea freight. Import duty rates depend on the HS code classification for WPC composite products \u2014 confirm the current rate with a licensed customs broker before your first order. Don&#8217;t assume duty-free status without checking.<\/p>\n\n<\/div>\n<\/div>\n<div id=\"faq-question-1792564524729\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question \">Are there shipping restrictions on composite decking from China into Australia?<\/h3>\n<div class=\"rank-math-answer \">\n\n<p>There&#8217;s no blanket ban. Composite boards containing natural wood fibre are subject to biosecurity screening under BICON rules, administered by the Department of Agriculture. Correct documentation avoids hold-ups at the Australian border.<\/p>\n\n<\/div>\n<\/div>\n<div id=\"faq-question-1792564525865\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question \">Can composite decking, screening, and cladding share a container?<\/h3>\n<div class=\"rank-math-answer \">\n\n<p>Yes. Products from all three categories can share one container. A mixed load may affect packing efficiency and total volume. Confirm the combination fits at the quoting stage and ask for a packing plan with the quotation.<\/p>\n\n<\/div>\n<\/div>\n<div id=\"faq-question-1792564526529\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question \">Do payment terms affect when production starts?<\/h3>\n<div class=\"rank-math-answer \">\n\n<p>Yes. Most manufacturers start production after the deposit is confirmed \u2014 typically 30% of the order value, with the balance paid before shipment. The production clock starts from deposit confirmation, not from the date you issue the purchase order. Factor that step into your full timeline.<\/p>\n\n<\/div>\n<\/div>\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>A late container can leave a distributor short of stock or a builder waiting for materials. Unexpected shipping and import costs can also cut into profit margins. For Australian businesses buying composite decking from China, factory production is only part of the timeline. Sea freight, customs clearance, and local delivery all affect when an order [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":11217,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1401],"tags":[],"class_list":["post-11215","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-composite-decking"],"_links":{"self":[{"href":"https:\/\/www.lastelegance.com\/au\/wp-json\/wp\/v2\/posts\/11215","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.lastelegance.com\/au\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.lastelegance.com\/au\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.lastelegance.com\/au\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.lastelegance.com\/au\/wp-json\/wp\/v2\/comments?post=11215"}],"version-history":[{"count":0,"href":"https:\/\/www.lastelegance.com\/au\/wp-json\/wp\/v2\/posts\/11215\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.lastelegance.com\/au\/wp-json\/wp\/v2\/media\/11217"}],"wp:attachment":[{"href":"https:\/\/www.lastelegance.com\/au\/wp-json\/wp\/v2\/media?parent=11215"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.lastelegance.com\/au\/wp-json\/wp\/v2\/categories?post=11215"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.lastelegance.com\/au\/wp-json\/wp\/v2\/tags?post=11215"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}